FG announces six-week partial closure of Lagos–Ibadan Expressway for bridge repairs

Posted admin News 135 Views 3 Min Read
3 Min Read

The Federal Government, through the Federal Ministry of Works, on Thursday, announced a six-week partial closure of the Lagos–Ibadan Expressway to carry out urgent repairs on expansion joints at Kara Bridge, Magboro Bridge, and Arepo–Punch Bridge.

The ministry said the closure became necessary to resume critical rehabilitation works that were previously suspended on the Lagos-bound section of Kara Bridge after public complaints about prolonged traffic congestion.

Addressing journalists at Kara Bridge, the Ogun State Federal Controller of Works, Michael Komolafe, apologised to motorists for the inconvenience and assured that improved traffic management arrangements would be implemented to ensure swift and durable repairs.

Komolafe explained that the expansion joints on the three bridges had deteriorated significantly, posing safety risks and contributing to crashes.

He stated that the Minister of Works, David Umahi, had directed that urgent repairs be carried out.

Komolafe added that work had already been completed on half of the Lagos-bound sections of Magboro and Arepo–Punch bridges, while the remaining portions on the Ibadan-bound side would now be addressed.

The contractor and General Manager of CBC Construction Company, Andy Duan, said the repairs would take six weeks, with mobilisation of equipment to be completed over the weekend and full construction expected to begin on Monday.

He disclosed that parts of the expansion joints at Magboro and Arepo–Punch bridges had been completed, while half of the Lagos-bound section at Kara Bridge was already done.

At Kara Bridge, we have finished half of it. So we are facing the other half of it. Instead of causing traffic, that’s why we suspended the work temporarily. Now we are getting instructions from the Ministry of Works to resolve this issue,” Duan said.

He further explained that the condition of the expansion joint for Kara Bridge was very poor and had been causing accidents.

Duan said that before the diversion begins, materials such as barriers would be brought in to protect the temporary working area. He added that traffic signs, warning lights, and other safety measures would be installed to ensure that traffic moves safely and workers are protected.

“We are supposed to start immediately, but we are shifting it to Monday. We expect to complete half of each expansion joint within a week. For the Ibadan-bound side, covering three bridges, we will divide the work into phases so each bridge takes about a week,” he said.

Meanwhile, the Lagos State Sector Commander of the Federal Road Safety Corps, Kehinde Hamzat, assured motorists that measures had been put in place to ensure smooth traffic flow during the construction period.

He warned against driving against traffic, noting that violators would be sanctioned.

Share this Article
Posted by admin
Follow:
A group of seasoned crime reporters drawn from reputable media organisations in Nigeria. To help in creating a friendly Nigerian Police Force that meets the yearnings and aspirations of the citizens towards policing and security of lives and properties. To showcase the positive sides of the Force, as well as celebrating the great feat of police personnel, who have shown uncommon courage in the discharge of his / her responsibility. In the same vein, through objective ratiocination, identify the areas of shortcomings for corrections. We welcome you on board on this journey to build an enviable Nigeria Police Force by actively playing the role of a watch dog. Watch out for crime stories and other security titbits.
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *